Safety Culture and ISO 9001, 14001 and 45001 in Civil Construction

Operational safety, Zoomlion crane lifting procedures and the Strategic Road Safety Plan (PESV).

Zoomlion telescopic crane used in an MIP INTERNACIONAL TRADING SAS lifting operation

Managing risks in lifting and deep excavation through digital pre-operation inspections and road safety procedures under the PESV framework.

1. Risk Management for Heavy Lifting

Lifting operations with Zoomlion telescopic cranes, including the ZTC500 and ZMC85 models mentioned in the original article, require an appropriate lifting plan, working-radius calculations, wind measurements and verification of ground conditions and outrigger setup. The equipment documentation and lifting plan govern each operation.

2. Digital Pre-Operation Inspections

The original article describes replacing paper forms with digital, georeferenced pre-operation checks, including a 42-item checklist before startup. It also mentions biometric capture. The company must confirm which systems are currently in use and the applicable privacy arrangements before presenting these features as established practice.

3. Sustainability and Waste Management

The original article states that, under ISO 14001:2015, MIP INTERNACIONAL TRADING S.A.S. works with authorized waste handlers to dispose of all used oil, coolant and metal filters, while promoting carbon neutrality in large infrastructure projects. The company must confirm these certification and environmental claims before publication.

← Back to all articles
YOUR NEXT STEP STARTS HERE

Your project needs capability.
Let's discuss how we can help.

Let's talk ↗
WhatsApp
MIP FLEET / EQUIPMENT DETAILS

Images are for reference. Confirm technical specifications, accessories, location and availability with our sales team before contracting.

Request a quote for this equipment ↗